In an attempt to speed up the set-up process, I'm constructing 4 verticals, that will remain rigged.
I have a rolling rack to hold them and only need to place them in position, and plug them in. They are controlled by wireless DMX. Set-up time for all 4 is under 5 minutes. Since I'm slowly getting out of the business, I wanted something elegant to finish off the remainder of my gigs.
Acrobats on the side, moving heads on top, and flat panel LED's on the sides. I'm programming a show as we speak... So far, they look amazing. Video from the gig in two weeks...
I have a rolling rack to hold them and only need to place them in position, and plug them in. They are controlled by wireless DMX. Set-up time for all 4 is under 5 minutes. Since I'm slowly getting out of the business, I wanted something elegant to finish off the remainder of my gigs.
Acrobats on the side, moving heads on top, and flat panel LED's on the sides. I'm programming a show as we speak... So far, they look amazing. Video from the gig in two weeks...