This is something That I know I must work on is take down. It Just seems with setup and take down and getting dresses or undressed it takes me between 1 hour to 1 hour in a half. It depends on whether I have lights to setup. The venue manager this week end commented that I had to much stuff.
And I didn't even have my lights to setup. I don't setup in my tux nor break down in it either. Though I have been fond of making sure the cords go all in the correct bags etc etc. Am I the only one here that takes that long to setup and tear down. I have a rock and roller cart but even loading all the stuff takes a while. Comments appreciated.
And I didn't even have my lights to setup. I don't setup in my tux nor break down in it either. Though I have been fond of making sure the cords go all in the correct bags etc etc. Am I the only one here that takes that long to setup and tear down. I have a rock and roller cart but even loading all the stuff takes a while. Comments appreciated.


:sqembarrassed: