I don’t mind tell you guys that I’m finding this conversation very confusing.
It might be in order to say that a distribution panel does not step down the voltage. The distribution panel only connects your equipment to the circuits that are available. If the supply panel doesn’t have the voltage you need, the distribution panel regardless of configuration will not be able to provide those voltages either.
Since both 220V (implying a standard Edison circuit) and three-phase distribution sets ups have been mentioned is anyone suggesting that there is one idiot-proof configuration that will suit the end user for both these applications? If you play just one venue, I see no problem. Taking your act on the road means plugging into unfamiliar receptacles, the variety of which can be daunting most especially to the non-technical among us.
Does anyone here believe the problem can be simplified to the point where the non-technical user can make the appropriate connections in various venues without problem?