This was inspired from a current thread but I did not want to derail it.
Question: If you were contracted to do a gig and when you arrive you found out (That for whatever reason) there was no power or available power. Also lets supposed that you yourself had no battery power OF ANY KIND, no backup or whatever, your laptop battery was dead etc. What would you do about your payment, would you..........See Poll.
 
Simple, Client provides power unless other arrangments are made. Its in the written agreement. I would expect to be paid the remaining balance.
 
My contract specifically states Client will make available suitable electrical supply for dj use, or words to that effect.

However, since I 99% of the time do a site survey, I would have known in advance that there was no power available.

I'd call a local generator supply/rental place and get one there ASAP and pass along the cost to the Bride & Groom.

So much for hypothetical threads. :(
 
My contract specifically states Client will make available suitable electrical supply for dj use, or words to that effect.

However, since I 99% of the time do a site survey, I would have known in advance that there was no power available.

I'd call a local generator supply/rental place and get one there ASAP and pass along the cost to the Bride & Groom.

So much for hypothetical threads. :(

Gosh! I knew someone would slip though with a loophole. Let us suppose there was power but then a transformer in the area went out and it was too late to get a generator, then what would you do?
 
he would probably call you on the Bat Phone and have you fly in quickly to save the day. Yes Canute I know the voodoo doll is being poked as I type.
OUCH!@#$%^&!!!!!!
 
We always carry a Honda EU2000 generator with us just in case. It isn't enough to run all the lights and everything, but at least they will still have the music and a couple of lights. The event won't be a total loss. Of course a fee for the use of the generator will be negotiated as it's being pulled out.

We have one client (a motocross park) that we always use the generator for. We just figure it in with the price when we quote the gig. It runs 4 SRM 450s and our equipment with no problem.
 
We always carry a Honda EU2000 generator with us just in case. It isn't enough to run all the lights and everything, but at least they will still have the music and a couple of lights. The event won't be a total loss. Of course a fee for the use of the generator will be negotiated as it's being pulled out.

We have one client (a motocross park) that we always use the generator for. We just figure it in with the price when we quote the gig. It runs 4 SRM 450s and our equipment with no problem.

OK lets try this again. In the Original Post the situation was that there was NO POWER whatsoever at the location or from the DJ, No type. Then what would you do?
 
OK lets try this again. In the Original Post the situation was that there was NO POWER whatsoever at the location or from the DJ, No type. Then what would you do?

OK, sorry about that. So, there is no power available and we haven't brought any power (because it was agreed that power would be supplied by the client)? Due to no fault of ours, we are unable to perform, but we did show up on time ready to play?

I would expect to be paid the balance. Depending on the customer, I would probably let them off at a reduced amount as long as we were leaving early, but each situation would require different thought.

How far did we have to travel to get there?
How much pre-planning did we have to do for this particular event?
Did we pass up another gig or obligation for this event? (in our case, did we leave school early?)
Is this a regular customer that I want to work with more in the future?
What were my total "out of pocket" expenses for this particular event?

Again, this question cannot be answered the same way for every event possiblity.

I understand that we have the right to demand payment in full, but in a world where "word of mouth" and reputation means so much, I would rather leave with a happy client and some money rather than an upset client and all the money.

Don't get me wrong, if the customer insists on paying in full, I'm not about to refuse that either.
 
Gosh! I knew someone would slip though with a loophole. Let us suppose there was power but then a transformer in the area went out and it was too late to get a generator, then what would you do?

...and then there were huge EMPs caused by sunspots, and then...

Twinspin had it right for the originally posted question.

If the blackout or non-power situation was a previously existing condition, I think most of our contracts leave them responsible- and with full payment due.

I DO carry backup power for emergencies, so I wouldn't run into a mid-event problem. However, if I didn't, then there would be a reduction in fee simply because I was not smart enough or professional enough to cover the circumstance.
 
here I am lucky

in 34+ so years I have only had a power outage twice

once for a car hitting a pole out the front of the venue...
which was fixed very quickly, might I add...

the second time was at another venue where lightning hit and blew out
more than just the pole.... lost an amp and speaker that day
but was replaced a few weeks later with new

the show was finished using the car's cassette stereo
now that was in 1983 long before computer laptops

we still got the money
we had people singing for thier food, was only way to get thru the night
on me changing cassettes etc
the bride and groom couldnt fore see this and neither could anyone else
but we got thru the show no worries at all....

now days wont travel to places like that as too far for backup

have a nice day
 
I voted demand our fee because most of our expenses are incurred prior to the start of the dance....in addition, we've lost a viable date to sell. I would, however, work with them if an Act of God caused the outage, and they could reschedule the following day (and our schedule allowed). Otherwise, we would incur full expenses again to travel again.

Now, I would say that I cringe at selecting DEMAND payment because that is a little harsh....and doesn't really allow for adjusting to circumstance.
 
First, my contract says electricity is the client's responsibility. I'd get paid either way.

But I also have power backups with me.



But back to the no-power scenario, I would...

...

...

...

ENTERTAIN!



Figure out something to do that does not require music:

Sing-a-long
Non-musical chairs
Coke & Pepsi (Have you ever done this with adults? LOADS of fun.)
etc.
 
ok, sorry about that. So, there is no power available and we haven't brought any power (because it was agreed that power would be supplied by the client)? Due to no fault of ours, we are unable to perform, but we did show up on time ready to play?

I would expect to be paid the balance. Depending on the customer, i would probably let them off at a reduced amount as long as we were leaving early, but each situation would require different thought.

how far did we have to travel to get there?
how much pre-planning did we have to do for this particular event?
Did we pass up another gig or obligation for this event? (in our case, did we leave school early?)
is this a regular customer that i want to work with more in the future?
What were my total "out of pocket" expenses for this particular event?

Again, this question cannot be answered the same way for every event possiblity.

I understand that we have the right to demand payment in full, but in a world where "word of mouth" and reputation means so much, i would rather leave with a happy client and some money rather than an upset client and all the money.

Don't get me wrong, if the customer insists on paying in full, i'm not about to refuse that either.

Excellent Answer!​
 
Now, I would say that I cringe at selecting DEMAND payment because that is a little harsh....and doesn't really allow for adjusting to circumstance.

Yep Val, You are correct, the word "Demand", especially when read in this context can sound a bit harsh.
I can see the chaps envisioning me yelling at the client for my payment. Thats not what I would do.
I guess the word "demand" should then be substituted for "expect" or "ask".
 
Several summers ago, I had just gotten back from a camping trip, where we used my Honda EU2000, and I was to perform at a 25th Anniversary Party (5-10 p.m., I think) the Saturday we got back. Super laid-back family and a easy to work with facility. I think I took these factors too far by thinking "eh, I'm not going to unpack the camping stuff and bring the generator." Wouldn't you know it, the power fails just after dinner, just after 7 p.m., and we're about to toast and have a first dance. Of course, we kept hoping for restoration (which never came). I led the toasting, via emergency lighting and no microphone. Before the battery on my laptop died, we did the first dance by me HOLDING my laptop a few feet from the couple, while they danced. The club kicked everyone out, just after 9 p.m. because it was now dark, and safety was a concern, not to mention how hot it had gotten since the air conditioning also requires electricity.

I let the clients lead the discussion. I offered a serious break on any kind of "do over" that they might desire. My packages are based on a four hour base rate, and additional hours beyond four. They asked that since they didn't use the fifth hour, could they receive that back. I agreed and gave it back.

I have always kept my generator with me since then.
 
Several summers ago, I had just gotten back from a camping trip, where we used my Honda EU2000, and I was to perform at a 25th Anniversary Party (5-10 p.m., I think) the Saturday we got back. Super laid-back family and a easy to work with facility. I think I took these factors too far by thinking "eh, I'm not going to unpack the camping stuff and bring the generator." Wouldn't you know it, the power fails just after dinner, just after 7 p.m., and we're about to toast and have a first dance. Of course, we kept hoping for restoration (which never came). I led the toasting, via emergency lighting and no microphone. Before the battery on my laptop died, we did the first dance by me HOLDING my laptop a few feet from the couple, while they danced. The club kicked everyone out, just after 9 p.m. because it was now dark, and safety was a concern, not to mention how hot it had gotten since the air conditioning also requires electricity.

I let the clients lead the discussion. I offered a serious break on any kind of "do over" that they might desire. My packages are based on a four hour base rate, and additional hours beyond four. They asked that since they didn't use the fifth hour, could they receive that back. I agreed and gave it back.

I have always kept my generator with me since then.

Well don't feel too bad. Even if you had brought the generator the venue would have kicked everyone out for safety's sake. As long as people are in the building the Fire Alarms, Air conditioner, pumps etc have to be powered.
Unless your generator can handle all that load then its the end of the event.


Now if you are doing a gig outdoors and you have a generator for your gear then thats different. However, if there are other things that also require electric power, the event may still come to an end.
 
A non issue really, because for liability sakes I don't know of a venue on Maui that would let a party go on in the dark.... If the power is out because of the transformer, we are done.... as far as payment goes, it would depend on my mood at the time. As with anything else.

If I am feeling bad for the B&G and I am having a good month, I wouldn't worry about it.... If it is my only gig for the month,,,, yep, I am getting paid.

If I was booked by one of my agents, they would and have paid me...