Powering a tent - my latest blog

To many ads? Support ODJT and see no ads!
Ah, Proformance, such a positive individual. My statement was that I often pull up to these private residence gigs, not knowing for sure if the client (the person responsible for supplying power) has actually done what they're contractually obligated to do. A majority of the time, they have not and I often end up being the one to pull extension cords (I carry 400 ft of 12-gauge at all times) or whatever to make the event come off.

Take the purple pics I posted in the article. The tent was about 300 feet from land power and dad had run a single, 16-gauge cord to power the entire tent. On the end of this cable he'd put a male plug and had run it thru a window at the house and plugged it into a 15-amp wall socket (which had come un-plugged). I'd talked to the bride a couple of days prior and she had assured me he'd have multiple circuits run, as well as a generator. When I got there, very little land power and no generator in sight. I had to (politely) hold his balls to the wall to make him go get the generator so we'd have enough juice to fire up the 2 lekos that ended up supplying all the ambient light for their evening. Now if I'd wanted, I could've sat back on my duff and watched the panic un-fold as I pointed to my contract but instead, I took care of the issues needed to make the event possible and the bride never had a clue how much of a slug her dad had actually been. That's the kind of customer service I give. Above and beyond the call.

As for whether I have a right to comment, I believe I do (and obviously the feedback I'm getting now is quite positive). If you understood as much biz as you claim you'd also have realized this isn't designed to be a "teach you how to do it yourself" article. It is designed to convince the prospect that we know our stuff and that we're ready and able to help them wherever they need help. The strategy has certainly resulted in more than a few signed contracts so I see no reason to not continue what's working.

As for back line support, I take care of my portion (and then some). They're obligated to provide power within 25 feet of my DJ table but we don't go the prima donna route and they seem to respond well to that in these parts. Frankly, I'd prefer to take my approach and make it happen rather than to sit back and play the "what's in the contract" game. Might be different where you're at or you could just be being an argumentative chap, like usual.
 
Carry longer cables. :)
As Murphy might have said .. "If you perceive that there are four possible ways in which something can go wrong, and circumvent these, then a fifth way, unprepared for, will promptly develop".
 
The most insightful part of the article is this:

We do a lot of tent events and I have to be honest, I usually pull onto the property, cringing because I don’t know what I’m up against (power-wise).​
The bride's number one question should be: "why are you showing up at events without knowing in advance that all of your electrical needs have been met?"

How do you go about knowing that in advance? Curious.

Paul
 
It is not difficult to plan these things in advance at all. If the Event is outside and in a tent there are a couple things to be noted. The actual location of the Tent bears little relevance.
1. Where is the source of the power? Will it be from a building or from a Generator.
2. Where would the tent be? What is the farthest distance from the Power source to the tent? What is the nearest distance?
3. What gauge of Power cord will be supplied if it is the farthest distance?
4. Who else would be sharing the power from the Extension to be given to you?
If you can arrange solutions to these answers then you should be prepared upon arrival to setup without a problem. However, we all know that things don't always go as planned. Why? Sometimes it is because other people take things for granted and don't know what the consequences will entail if THEY don't do as planned. So what is a DJ to do?

Here is what works for me each and every time. First, I will emphasize upon the Client verbally and in the written agreement that if the arrangements and criteria are not met, then there is a good possibility it could ruin their day. Period! I make sure they understand that statement. It needs to be said with utter seriousness that it remains imbedded in their mind that no shortcuts are to be taken and they will be the ones responsible if there is a broken link in the chain. Second, I will bring whatever extra gear I have, just in case.
 
It is not difficult to plan these things in advance at all. If the Event is outside and in a tent there are a couple things to be noted. The actual location of the Tent bears little relevance.

You make assumptions that the info you're given is correct. Must be nice to live in your world because it sure doesn't work that way in mine. I'll go point by point regarding this particular job:

1. Where is the source of the power? Will it be from a building or from a Generator.

Asked that. Was told power would be coming from circuits that were hard-wired into the house. After all, dad is a professional maintenance man who does electrician work all the time. They also promised there would be a generator there as well.

2. Where would the tent be? What is the farthest distance from the Power source to the tent? What is the nearest distance?

Asked that. Was told a couple hundred feet. It was more like 300. incidentally, the voltage was 105. Thank goodness for my regulator.

3. What gauge of Power cord will be supplied if it is the farthest distance?

Was told 10-gauge, solid-core wiring. Got 16-gauge non-solid-core that had a plug put on the end and they had it run into a window to a spare bedroom. Incidentally, the plug had fallen out and I had to open the window, climb in (yes, breaking and entering) and get the plug secured. Keep in mind this was 60 miles from home, out in the country and the family was all gone to the ceremony at this point.

4. Who else would be sharing the power from the Extension to be given to you?

Was promised dedicated circuits. Dad wanted to plug coffee-makers into this line but finally backed down when I explained that it was going to (not maybe) pop the breaker.

If you can arrange solutions to these answers then you should be prepared upon arrival to setup without a problem.

Like I said, in a perfect world. In mine you have to make last-minute adjustments and make it happen sometimes.
 
Did you do a site visit?
 
Does your liability insurer know 1) you're running a multi op 2) you're rigging lights 3) providing "live" entertainment 4) offering a photo booth 5) offering uplighting, monograms, ambiant lighting

Yes to all of the above. If you have Mavon insurance through WEDJ they can cover you for additional events in the same day. Uplighting/monograms are covered under DJ portion (basically anything that doesn't hang from the venue). They also can cover for multiple photo booths in a day. I sleep A LOT better at night with this type of coverage.
 
No. It was 60 miles away and besides, what's a site visit going to do for you when it's an open field? The tent wasn't installed until right before the event, hoss. The power wasn't run until the morning of.

fail.
A site visit will tell you from where the power would be coming. You factor in the cost of doing a site visit (Especially one that far away) into your final price. I honestly believe that the reason I don't get problems when I arrive is because I do site visits. The Clients tend to respect and take you more seriously when you take the time to come out and view the place. That is the perfect time to emphasize your DJ needs and as to why they need to follow them to the letter. They usually do.
 
No. It was 60 miles away and besides, what's a site visit going to do for you when it's an open field? The tent wasn't installed until right before the event, hoss. The power wasn't run until the morning of.

fail.

Okay, it really pains me to say this, but I agree with Houston. This is a cop-out. We've done site visits 400 miles away. Why? Because we take our job and performance seriously. And not just the paycheck end. When we do a site visit, we can tell what power is run INTO the building, and therefore, know if power can be had. Had you visited the location in advance, you could have specified outlets that were appropriate, and inspected the cable they were to be using. You would have known you had residential circuits to deal with, you would have known the distance, and you most likely could have looked at the wire and decided if you should bring your own or if it was appropriate. A site visit doesn't mean final inspection.

Yes, things don't always go according to plan, but you can make a few small efforts that allow you to have a backup plan in place.
 
Okay, it really pains me to say this, but I agree with Houston. This is a cop-out. We've done site visits 400 miles away. Why? Because we take our job and performance seriously. And not just the paycheck end. When we do a site visit, we can tell what power is run INTO the building, and therefore, know if power can be had. Had you visited the location in advance, you could have specified outlets that were appropriate, and inspected the cable they were to be using. You would have known you had residential circuits to deal with, you would have known the distance, and you most likely could have looked at the wire and decided if you should bring your own or if it was appropriate. A site visit doesn't mean final inspection.

Yes, things don't always go according to plan, but you can make a few small efforts that allow you to have a backup plan in place.

Valerie, with the major-level stuff you guys do, I can see that. With a one-off, tent, at a private residence, I disagree. Even had I done a site visit the week before, I would've gotten the same answer from slacker-dad. "I'm going to run you a dedicated line, blah blah blah." and then I would've shown up the day of and found the mess he did instead. At the end of the day, I still would've had to make the adjustments I did and I would've been out an entire day, along with fuel for the trip. Under my circumstances, with a day job, that's not workable. We'll have to agree to disagree.
 
Respectfully, I disagree. A well-done wedding will bring in just as much revenue and the event is just as important. I call BS. Had you visited the site, you would have known that you need to perhaps bring 300' of quality extension cord, or even 600' to run 2 lines and split up your usage to 2 residential (15A) outlets. Why are you blaming slacker dad? Does he know what your power consumption is? Is he supposed to know what an acceptable cable is? Does he even know there is a difference in AC supplied to a residential outlet vs. a commercial? Even if he does some electrical work, you're expecting unreasonable knowledge of him. He doesn't know what happens if needs aren't met; why should he? Take control of your own. A face to face meeting will lend a lot more credibility to the demands you place....it makes slacker-dad maybe not such a slacker, but perhaps an overworked, unable to do everything on his plate guy. If everyone else is always the idiot, you need to re-evaluate.
 
Valerie, with the major-level stuff you guys do, I can see that. With a one-off, tent, at a private residence, I disagree. Even had I done a site visit the week before, I would've gotten the same answer from slacker-dad. "I'm going to run you a dedicated line, blah blah blah." and then I would've shown up the day of and found the mess he did instead. At the end of the day, I still would've had to make the adjustments I did and I would've been out an entire day, along with fuel for the trip. Under my circumstances, with a day job, that's not workable. We'll have to agree to disagree.
Accepting the promise of a dedicated line is not a specification. A dedicated line in their understanding, can mean a two conductor zip cord. Again, you have to be specific and explain why it is important that they follow your instructions. You are the professional. The average residential client is usually not knowledgeable about these things. I know that most DJs don't carry or use the kind of systems that I do, this is why I do site visits. I tell the Venue that the regular stuff they have used in the past may not be adequate for me so I outline my needs if they are different from what they are offering me.

It does not hurt to make statements like, "If these things are not done as described, it can cause a disastrous delay". "I may not be able to power up the equipment", "If you put chairs and tables between the speakers and the dance floor it will cause major discomfort to those seated guests" etc.
 
How do you go about knowing that in advance? Curious.

Paul


By being responsible enough to recognize that you're the professional and are supposed to have the technical knowledge your customer doesn't. The fact that you write something in a contract does not make your client or any other vendor an expert on your electrical requirements. Rick's constant references to his "contract" are just lame excuses for not doing his homework too see that his staging needs are being properly met.

Demanding that people support you with a level of expertise they don't have - and then using your "contract" to blame them for your headaches when they don't get it right is patently unprofessional. When the tent is on residential property and the event managed by the end user themselves it's a very likely bet that there's no one involved with extensive knowledge of providing the right electrical supply. You can't simply hand them a "contract" or memo and expect good results.

If a tent company told you they can't setup until you get them some pole flats because your ground was too soft - would it not occur to you that it was their responsibility to check out the ground, and determine EXACTLY what type of tent equipment to acquire or use?

Where does a DJ get off telling someone for example, they need a 60A supply without specifying in what form and EXACTLY how and from where to get it? If you can not provide it yourself and the work should be done by a qualified electrician then you need to include that in your bill and get it done on your own behalf, or refer the customer and then follow-up to see that it is completed on time.

All of this involves EXTRA COST and if you think that by passing off the responsibility to someone else the customer will not associate that extra cost with hiring you - then you are mistaken. In fact, they may even resent not being properly informed and directed. Properly disclosing this hidden cost at the onset will make you look better informed about events in general and more professional.
 
Respectfully, I disagree. A well-done wedding will bring in just as much revenue and the event is just as important. I call BS. Had you visited the site, you would have known that you need to perhaps bring 300' of quality extension cord, or even 600' to run 2 lines and split up your usage to 2 residential (15A) outlets. Why are you blaming slacker dad? Does he know what your power consumption is? Is he supposed to know what an acceptable cable is? Does he even know there is a difference in AC supplied to a residential outlet vs. a commercial? Even if he does some electrical work, you're expecting unreasonable knowledge of him. He doesn't know what happens if needs aren't met; why should he? Take control of your own. A face to face meeting will lend a lot more credibility to the demands you place....it makes slacker-dad maybe not such a slacker, but perhaps an overworked, unable to do everything on his plate guy. If everyone else is always the idiot, you need to re-evaluate.

Ah, but there's the difference, a "well-done wedding". I'm dealing with budget brides, not big-money events. As for extension cord, I do carry a few hundred feet of 12-gauge however, I assessed the situation and decided I could make-do. In that sense, I was being a slacker from doing extra work.

Now as for why I called dad a "slacker", that probably deserves a bit more explanation. Everything that was presented to him, by myself and others was met with "Well nobody told me". Instead of just doing something to remedy his own screw up he'd offer his standard pass-the-buck excuse then wait to be pressed before he'd actually do anything. He made claims to be an electrician. He made claims that he'd provide a generator. He did the bare minimum possible and then only after he was pressed into it. That's why I termed him a slacker. I found out later that he was a maintenance guy for the county school system.
 
By being responsible enough to recognize that you're the professional and are supposed to have the technical knowledge your customer doesn't. The fact that you write something in a contract does not make your client or any other vendor an expert on your electrical requirements. Rick's constant references to his "contract" are just lame excuses for not doing his homework too see that his staging needs are being properly met.

Demanding that people support you with a level of expertise they don't have - and then using your "contract" to blame them for your headaches when they don't get it right is patently unprofessional. When the tent is on residential property and the event managed by the end user themselves it's a very likely bet that there's no one involved with extensive knowledge of providing the right electrical supply. You can't simply hand them a "contract" or memo and expect good results.

If a tent company told you they can't setup until you get them some pole flats because your ground was too soft - would it not occur to you that it was their responsibility to check out the ground, and determine EXACTLY what type of tent equipment to acquire or use?

Where does a DJ get off telling someone for example, they need a 60A supply without specifying in what form and EXACTLY how and from where to get it? If you can not provide it yourself and the work should be done by a qualified electrician then you need to include that in your bill and get it done on your own behalf, or refer the customer and then follow-up to see that it is completed on time.

All of this involves EXTRA COST and if you think that by passing off the responsibility to someone else the customer will not associate that extra cost with hiring you - then you are mistaken. In fact, they may even resent not being properly informed and directed. Properly disclosing this hidden cost at the onset will make you look better informed about events in general and more professional.

You're talking out of both sides of your mouth. Above, you say that I'm being patently unprofessional by not disclosing all this info to the client. In your earlier post you stated:

I see no need to tell a bride anymore about electrical service than what it is I require to do the DJ job.

Which is EXACTLY what I did in my contract. I specified power requirements. They didn't meet them. I adjusted and made it work anyway then came back here to whine about it (out of ear-shot of the client). The event was a success and the bride never knew there was a problem. So which is it, do you have to take responsibility for the power or do you stick with your contract that states "Power shall be provided within 25 feet of the DJ table"? You can't have it both ways.
 
By being responsible enough to recognize that you're the professional and are supposed to have the technical knowledge your customer doesn't.

So you are saying that by being responsible and professional I will know that my power needs are met in advance? Well I will tell you from first hand experience that being both of those things and more is no gaurantee. There have been times I pulled up on an outdoor event to find they have a bad breaker (that was working on our site visit) scrambling to get Sunbelt to deliver a diesel generator and arguing with the customer that they are paying for it. THEN the generator arrives and it has a faulty breaker! Your statement is that of inexperience or just plain dumb luck that every job you have pulled up to didn't have an electrical issue beyond your recognized non-licensed electrical responsibilty and professionalism. Good on ya for being that lucky but one day your luck is going to run out the more outdoor or "tent" events you do. Hang in there grasshopper!

Paul
 
Yes, things don't always go according to plan, but you can make a few small efforts that allow you to have a backup plan in place.
This I will agree with Val. Setting up an account with a rental company ( choose a national company) is crucial. BVut I have to respectfully disagree with a site visit is going to allow you to know that you electrical needs are met the day of. Transformers blow everyday.

Paul