I'm using lights more & more for wedding receptions, conversely I'm eating less & less.
Most recently, it was at my December 30th evening wedding....I packed the lights into the van on Friday, knowing they would be needed for Sunday (NYE).
At first, the bride didn't want the free lights, even though the groom, groomsmen, and MOH wanted them real bad. They were able to talk her into it.....using my logic that it was the "night before NYE" and we need to use all the available ammo to keep the crowd dancing and not going home to rest for next eve....
Sure enuf, the lights turned out to be awesome (but sorta puny for the size of the large hotel ballroom). Easy to set up, it just uses two small tripods, and the DMX fixtures were master-slave configuration (each pair of Alpha-moons & Verti-PROs is synchronized to run identical patterns), sound activated, with a simple set of power strips to activate (easier to set up than the DMX controller). The "Cluster" (centerpiece) sits on the table, but I'm sure there are better ways to mount it for maximum effect. Previously, entire setup of the lites was only 10 minutes up and 10 minutes down.
Now that I'm adding the "intels" to the mix (two Chauvet Mini-Legends with EZ Controller), I'm wondering if the "ease of setup" aspect is a thing of the past. These units weigh 26.5 pounds each, which is more than double what my current fixtures weigh.
Overhead trusses, at first glance, aren't appealing because I don't wanna make the wedding reception look like a HS dance. Then again, maybe there is a truss that looks "elegant" without being gaudy.
Another option is to use my passive speakers in a large ballroom, haul in the extra amp case, and then use the Intels on top of the speakers. Chances are, if the client wants lights its gonna be a big venue with a huge ceiling.
I may retire the 4-year-old DMX fixtures. they still look and work great, but in smaller venues, the Intels would handle the entire light show. Then again, in a big room those extra tripods of lites would make my setup look more impressive, with the Mini-Legends on top of the speakers on each side (they look like something out of a Star Wars or Robo Cop movie), with the other two tripods behind me, holding the other 4 fixtures, in the middle. Who knows, I may break out the DMX lighting controller to operate all six pieces. But I'm lazy so its EZ controller (and power strips) for now.
Apologies for the duplicate thread, but I'm sure that not everyone reads the "Light Shack" board, so maybe some of you wedding DJs can chime in on what they do at weddings when they run lites.
Most recently, it was at my December 30th evening wedding....I packed the lights into the van on Friday, knowing they would be needed for Sunday (NYE).
At first, the bride didn't want the free lights, even though the groom, groomsmen, and MOH wanted them real bad. They were able to talk her into it.....using my logic that it was the "night before NYE" and we need to use all the available ammo to keep the crowd dancing and not going home to rest for next eve....
Sure enuf, the lights turned out to be awesome (but sorta puny for the size of the large hotel ballroom). Easy to set up, it just uses two small tripods, and the DMX fixtures were master-slave configuration (each pair of Alpha-moons & Verti-PROs is synchronized to run identical patterns), sound activated, with a simple set of power strips to activate (easier to set up than the DMX controller). The "Cluster" (centerpiece) sits on the table, but I'm sure there are better ways to mount it for maximum effect. Previously, entire setup of the lites was only 10 minutes up and 10 minutes down.
Now that I'm adding the "intels" to the mix (two Chauvet Mini-Legends with EZ Controller), I'm wondering if the "ease of setup" aspect is a thing of the past. These units weigh 26.5 pounds each, which is more than double what my current fixtures weigh.
Overhead trusses, at first glance, aren't appealing because I don't wanna make the wedding reception look like a HS dance. Then again, maybe there is a truss that looks "elegant" without being gaudy.
Another option is to use my passive speakers in a large ballroom, haul in the extra amp case, and then use the Intels on top of the speakers. Chances are, if the client wants lights its gonna be a big venue with a huge ceiling.
I may retire the 4-year-old DMX fixtures. they still look and work great, but in smaller venues, the Intels would handle the entire light show. Then again, in a big room those extra tripods of lites would make my setup look more impressive, with the Mini-Legends on top of the speakers on each side (they look like something out of a Star Wars or Robo Cop movie), with the other two tripods behind me, holding the other 4 fixtures, in the middle. Who knows, I may break out the DMX lighting controller to operate all six pieces. But I'm lazy so its EZ controller (and power strips) for now.
Apologies for the duplicate thread, but I'm sure that not everyone reads the "Light Shack" board, so maybe some of you wedding DJs can chime in on what they do at weddings when they run lites.
And Jfactor1 your setup dose look sweet. I have lately been using a duratruss with a mirror ball in the middle and the 600's one at each end. It looks clean and simple. But very effective.